Master Stop Instructions

Anti-Slip Paint

COVERAGE - Approximately 125 sq. ft. depending on thickness

TOOL - Roller or Brush

DRYING TIME - Curing time (depending on the temp. and humidity) happens within 8 hours, but would be better over 23 hours.

APPLICATION - Large Jobs - Pour small amounts at a time. Stir frequently.
Small Jobs- Mask off area. Brush on directly from can.
For thin coating finish with a brush. For Rougher surface, finish with dabbing twisting motion.

SURFACE PREPARATION
Concrete - New concrete should age 3 months. Un-painted concrete should be etched with 1 part muratic acid to 4 part water. Rinse thoroughly and dry completely prior to coating.
Wood - Treated lumber should age 3 months. Sand where needed. Clean and dry thoroughly prior to coating.
Metal - Remove rust, scale, dirt and grease. Prime unpainted surface with a metal primer. Allow 24 hours before coating.
Fiberglass - Sand surface prior to coating. Clean and dry completely.
Paints Surfaces - Remove all dirt and flaking paint. Prime where necessary and sand surface. Clean and dry completely.

**ALL SURFACES SHOULD BE CLEANED AND DRIED THOROUGHLY
PRIOR TO COATING.

CLEAN UP - Clean tool immediately with Soap and Water

BEST RESULTS - Mix thoroughly. Stir Frequently while using. Drill power mixer suggested. DO NOT ATTEMPT OT SPRAY.

INTENDED USE - User shall determine suitability of the product for intended use. All risks and liabilities in connection with this product are limited to replacement of the product by the manufacturer.

My Account

Custom Products

Custom Products

More Info

Gifts

(800) 240-6039